Construction of a complex of 4 commercial and office buildings

Turnkey engineering and construction of a building divided into 4 commercial warehouses on the ground floor and office mezzanine. The main challenge of the project was the optimization of the repetitive structural system and the passive fire protection technical solutions between the different tenants. To achieve both objectives at the same time, we have developed a technical solution of a prestressed concrete girder that optimizes the technical solution while guaranteeing sectorization between buildings, increasing structural and economic efficiency, while reducing the assembly time. of the building.

category

Prefab Commercial Construction

location

Narbonne (France)

M2

Frame

Prefabricated

Do you want more information?

Interested in a similar project? We create your project

interior/exterior of prefabricated commercial construction H&M

Shape
Shape

Our completed projects

Explore more projects in the same category

Our track record of more than 45 years of experience and more than 1M square meters built support us.

×